I'm building a new home in Western North Carolina — at what stage of construction should I pick my fireplace and rough in the gas line, framing, and venting?

Pick your fireplace before framing — ideally at the design stage. A factory-built fireplace has to be set and framed around, its vent path decided, and its gas line roughed in before drywall closes the walls. Wait until the house is finished and you're paying to tear things open. The order is: choose the unit, frame the opening and chase, run and pressure-test the gas line, install venting, then close up.

Decide During Design, Not During Drywall

The single biggest new-build mistake we see is treating the fireplace as a finish item, like paint. It's structural. The specific model dictates the framed opening dimensions, the clearances to combustibles, the chase location, the vent route, and where the gas stub comes up. All of that has to be on the plans before framers start.

Pick your unit while you're still working with the builder and architect and everything downstream falls into place. Pick it after the walls are up and you're reopening finished work to make it fit.

The Rough-In Sequence

Here's the order that keeps a build clean. First, select the appliance and confirm its exact framing and venting specs. Second, the fireplace box gets set and the framers build the opening and chase around it. Third — while the walls are still open — we run and pressure-test the gas line to the firebox and pull the permit with your county.

Fourth, the venting goes in: a direct-vent coaxial pipe out a sidewall or up through the roof, sized and routed per the manufacturer. Only then do insulation, drywall, and finish — stone, mantel, surround — close everything in. Miss a step and something gets buried that shouldn't be.

Coordinate the Trades — and Who Does What

On a new build several trades touch this corner of the house: framers, the mason or hardscaper for stone, the electrician for a nearby switch or blower circuit, and us for the appliance, venting, and — the licensed part — the gas line. In North Carolina, running or extending that gas line is licensed work; your framer or general contractor legally can't connect fuel, but we can, and we permit and pressure-test every line we run.

Loop us in early, share the plans, and we'll spec the rough-in so your builder frames it right the first time. Building now? Call (828) 545-0525 or bring your plans by the Asheville showroom.